Product costing in manufacturing adds up everything it takes to make one unit: direct material, direct labour, machine and power costs, a fair share of factory and office overheads, and an allowance for scrap. The most practical method for Indian job shops is a machine hour rate, which puts most conversion costs into one hourly figure applied to each part's cycle time.
What is product costing?
Product costing is working out the full cost of making one unit of a product or part. It tells you the lowest price you can quote without losing money, which products and customers are truly profitable, and whether to make a part in-house or buy it.
Many small factories price from memory or copy last year's rates. That works until material, wages or power costs change, and then margins disappear without anyone noticing.
What are the elements of product cost?
Product cost has five main elements, and adding them in layers gives the standard cost sheet used in Indian cost accounting.
Element | What it includes |
|---|---|
Direct material | Raw material, bought-out parts, freight inward, less scrap recovery |
Direct labour | Wages of operators working directly on the part, at their full cost to the company |
Direct expenses | Costs specific to the job, such as outside heat treatment, plating or job-specific tooling |
Factory overheads | Power, maintenance, depreciation, supervision, quality control, stores, consumables, factory rent |
Office and selling overheads | Administration, accounts, sales, office rent and similar costs |
These build up in steps:
- Prime cost = direct material + direct labour + direct expenses
- Factory cost = prime cost + factory overheads
- Total cost = factory cost + office and selling overheads
The Institute of Cost Accountants of India publishes cost accounting standards if you want the formal definitions.
How do you calculate material cost per piece?
Calculate material cost from the gross weight you buy and cut, not the finished weight, and subtract the value of scrap you can sell.
Example: A turned part is made from mild steel bar. Each blank weighs 1.2 kg and the finished part weighs 0.9 kg. Steel costs ₹75 per kg and turnings sell for ₹30 per kg.
Step | Calculation | Amount |
|---|---|---|
Gross material | 1.2 kg × ₹75 | ₹90.00 |
Scrap recovery | 0.3 kg × ₹30 | −₹9.00 |
Net material cost | ₹81.00 |
Add freight inward if your supplier's price does not include delivery. All numbers in this article are illustrative.
How do you calculate a machine hour rate?
A machine hour rate is the total yearly cost of running a machine, including its share of overheads, divided by the productive hours it actually runs in a year. Multiply it by a part's cycle time to get the machining cost.
\text{Machine hour rate} = \frac{\text{total yearly cost of the machine}}{\text{productive hours per year}}
Example: A CNC turning centre runs 2 shifts of 8 hours for 300 days, which is 4,800 hours. At a realistic 80% utilisation, it has 3,840 productive hours a year.
Cost item | Basis | Yearly cost |
|---|---|---|
Depreciation | ₹30,00,000 machine over 10 years | ₹3,00,000 |
Power | 10 kW × 70% load × ₹9 per kWh × 3,840 hours | ₹2,41,920 |
Maintenance | Service, spares and repairs | ₹1,20,000 |
Operators | 2 operators × ₹25,000 a month × 12 | ₹6,00,000 |
Tooling and consumables | Inserts, coolant, oil | ₹1,50,000 |
Space and utilities | Share of rent, lighting, air | ₹60,000 |
Factory overhead share | Supervision, quality, stores | ₹2,00,000 |
Total | ₹16,71,920 |
Machine hour rate = ₹16,71,920 ÷ 3,840 = about ₹435 per hour.
Two points matter most. Use the full cost of each operator, including employer contributions such as EPF, not just the salary. And use realistic productive hours: if you divide by all 4,800 hours, the rate drops to about ₹348 and every quotation is underpriced. Your real utilisation comes from downtime data.
How do you allocate overheads to products?
Allocate overheads using the method that best reflects what drives them in your factory. The common methods are:
- Machine hour rate: best for machining, moulding and other machine-intensive work.
- Labour hour rate: best for assembly, fabrication and manual work.
- Percentage of prime cost or material: simple, but can distort costs between material-heavy and labour-heavy parts.
- Percentage of factory cost: common for office and selling overheads.
Use different rates for different machines. A single overhead percentage for the whole factory makes simple parts look expensive and complex parts look cheap.
What does a complete cost sheet look like?
A complete cost sheet lists each element per piece, from material to total cost. Here is the turned part from the examples above, in a batch of 500 pieces.
Element | Calculation | Per piece |
|---|---|---|
Net material | From the material example | ₹81.00 |
Machining | 4.5 min ÷ 60 × ₹435 | ₹32.63 |
Setup | 2 h × ₹435 = ₹870 ÷ 500 pieces | ₹1.74 |
Heat treatment (outside) | Vendor rate | ₹8.00 |
Inspection and packing | ₹2.50 | |
Factory cost | ₹125.87 | |
Rejection allowance of 2% | ₹125.87 × 1.02 | ₹128.39 |
Office and selling overheads at 8% | ₹128.39 × 8% | ₹10.27 |
Total cost per piece | ₹138.66 |
This is the cost, not the price. To turn it into a profitable quotation with the right margin, quantity breaks and material clauses, read our guide on how to price custom manufacturing jobs profitably.
What are the most common product costing mistakes?
The most common mistakes all make costs look lower than they really are:
- Using salary instead of the full cost of employment
- Dividing machine costs by all available hours instead of productive hours
- Leaving out setup time on small batches
- Using material rates from months ago
- Applying one overhead percentage to every machine and process
- Ignoring scrap, rejections and rework
- Forgetting office and selling overheads
How do you check whether your costing is accurate?
Compare the cost you quoted with the actual cost after the job is done. This is the difference between standard cost, what you planned, and actual cost, what really happened.
Check actual material used, actual cycle and setup times from production records and actual rejections. If a part keeps running slower than quoted, either the cycle time or the price needs to change. Recording production and downtime as it happens, for example through production tracking on WhatsApp, gives you the actual times without extra paperwork.
Where does AI help with product costing?
AI helps keep costing rates current and applies them consistently to every enquiry. Useful tasks include:
- Updating material rates from the latest purchase bills, as covered in our guide to automating purchase bill entry in Tally
- Pulling actual cycle times and rejection rates from production logs
- Applying your costing sheet to every new enquiry the same way
- Comparing quoted and actual costs for completed jobs, and flagging parts that lose money
Osvik's RFQ to quotation automation uses your own costing sheet and rate list to draft each quotation, so estimates stay consistent even when your senior estimator is busy. Many factories keep that costing sheet in Excel or Google Sheets, and it can stay there.
Build one machine hour rate this week
Pick your busiest machine, list its yearly costs using the table above and divide by its realistic productive hours. Compare the result with the rate your estimators use today. The gap, if there is one, is profit you are giving away on every job.
If you want your costing rules applied to every quotation automatically, book a free call. If a task repeats in your factory, tell us about it.
Frequently asked questions
What is product costing in manufacturing?
Product costing is the process of calculating the full cost of making one unit, including direct material, direct labour, direct expenses, factory overheads and office and selling overheads. It is the basis for pricing, measuring profitability by product and customer, and deciding whether to make or buy a part.
What are the three main elements of product cost?
The three main elements are material, labour and overheads. Material covers raw material and bought-out parts; labour covers people working directly on the product; overheads cover everything else needed to run the factory and office, such as power, maintenance, depreciation, supervision and administration.
How do you calculate a machine hour rate?
Add up the yearly cost of running the machine, including depreciation, power, maintenance, operators, tooling, space and a share of factory overheads. Divide the total by the machine's realistic productive hours per year. Multiply the rate by a part's cycle time to get its machining cost.
What is a cost sheet?
A cost sheet is a statement that shows the cost of a product in stages: direct material, direct labour and direct expenses make up prime cost; adding factory overheads gives factory cost; adding office and selling overheads gives total cost. It is usually shown per unit and for a batch.
What is the difference between prime cost and factory cost?
Prime cost is the total of direct material, direct labour and direct expenses. Factory cost, also called works cost, is prime cost plus factory overheads such as power, maintenance, depreciation and supervision. Adding office and selling overheads to factory cost gives total cost.
How often should manufacturing costs be updated?
Review your costing rates at least once a year, when wages and budgets change. Update material rates whenever supplier prices move significantly, and check machine hour rates when utilisation, power tariffs or maintenance costs change. Comparing quoted and actual costs every month shows when rates are out of date.